We were having a rare old time today over at Lianne's place. One part of that discussion in particular, focused around people who are 'always doing rather than being' and is the basis of a favourite saying of mine, "Try to be a human being not a human doing". Essentially it means being busy, busy all the time is not necessarily the right thing - sometimes you just have to stop and 'be'.
This also ties in with a previous post of mine - just by 'being' and not 'doing', you can sometimes save yourself a lot of flailing arms and misspent energy because what is meant to be, is just that - meant to be.
In my recent poetry phase I scribbled a little ditty which sums up trying to control time - or was it time trying to control me? Not sure there. Once I have unearthed it (probably in folder filled with the last - yippee! - of the plaster dust) I will post it here.
Showing posts with label building. Show all posts
Showing posts with label building. Show all posts
Saturday, May 26, 2007
Monday, March 19, 2007
Is this really it?
Perhaps, just perhaps. I may have finally done it. I have had two minutes to get this darn blog off the ground. Sick of being sighed at by Lucy et al, I decided it was time. Although I still don't know how I do all the things 'The Others' have on their blogs, but I'm sure I'll be told. Must just add it was lovely to catch up with y'all at Adrian Mead's excellent course in very writerly Bloomsbury on Saturday. Ass-pinching & boob-groping aside, it really was a splendid day.
So, here I am. The builders have gone - and left me in a heap of plaster dust - but at least they have gone. They forgot to take their spikey haired sparky with them, so he keeps popping up to finish power points, light switches, heating control valves and little riveting jobs like that. Actually, I'm not sure if he's living in the house somewhere and just hibernates over the weekend. Perhaps when I get round to the last packed boxes and cleaning up the final speck of dust (ha ha ha) I'll find his little den - or whatever electricians hibernate in. Until then, I guess he'll keep scuttling out of his socket den and find a wire to adjust.
One of the builders asked me why I had so many power points installed. My answer: I like having the power. It went over his head too.
Had better move on now as I really should unpack a pot, pan or something. Takeaways are wearing thin after three months. Until next time.
So, here I am. The builders have gone - and left me in a heap of plaster dust - but at least they have gone. They forgot to take their spikey haired sparky with them, so he keeps popping up to finish power points, light switches, heating control valves and little riveting jobs like that. Actually, I'm not sure if he's living in the house somewhere and just hibernates over the weekend. Perhaps when I get round to the last packed boxes and cleaning up the final speck of dust (ha ha ha) I'll find his little den - or whatever electricians hibernate in. Until then, I guess he'll keep scuttling out of his socket den and find a wire to adjust.
One of the builders asked me why I had so many power points installed. My answer: I like having the power. It went over his head too.
Had better move on now as I really should unpack a pot, pan or something. Takeaways are wearing thin after three months. Until next time.
Filed Under:
Builders,
building,
electricians,
insanity,
renovation,
Writing course
Subscribe to:
Posts (Atom)